ome of the features including seat declining angle, better cushion for seats, better accessibility to mobile charging points than before, extended foot-rest in the Executive Chair cars among others, an official release said.
On August 15 last year, Prime Minister Narendra Modi announced from the ramparts of the Red Fort that the Indian Railways would launch 75 Vande Bharat Express trains by August 2023. Later, in her 2022 Budget speech, Finance Minister Nirmala Sitharaman announced that 400 Vande Bharat trains will be manufactured in the next three years, which are expected to cost between Rs 40,000 crore and Rs 50,000 crore. Those upbeat announcements come after a series of cancelled tenders, vigilance actions against officials and interdepartmental rivalry that delayed the addition of these iconic trains developed entirely indigenously by the Integral Coach Factory (ICF) in Chennai.
India's iconic Vande Bharat train project may finally find a solution to its two Russian-related issues.
CRRC Pioneer Electric (India) Private Limited, whose bid for the project is a joint venture of the Chinese firm CRRC Corporation Ltd with a Gurugram-based company according to its website, is one of the six contenders for the tender for procuring propulsion systems or electric traction kits for 44 trains to function as the Vande Bharat Express or Train 18.
The Railway Board and employees at Integral Coach Factory in Chennai, makers of the train, are at loggerheads over the proposed transfer of design and reassigning the manufacturing of Train 18 to Modern Coach Factory in Raebareli.
While the chair car fares are 1.5 times the base price of Shatabdi trains running the same distance, the executive class fares are 1.4 times that of the base fare of first class air conditioned seating in the premium train
LHB coaches are safer. Two high-level railway safety commissions came down heavily on ICF coaches, recommending their replacement by LHB, says Bibek Debroy.
The window of one of the coaches of the Rs 100-crore train was damaged.
'This is not just Make in India; this is much more than that. Right from design to delivery, everything was done in India.'
A Ganesh Nadar/Rediff.com brings you some fascinating facts and photographs from India's first international rail exhibition.
'All Shatabdis and Rajdhanis should be converted to this type of high-speed train.' 'There should be a sleeper version of the train.' 'Right now, there is only a day version of the train.' 'Unless you develop a sleeper version, it will not be possible to replace the Rajdhani.' 'Work on the sleeper version was stopped for some reason. It should be revived now.'
S Bhaskaran is the first bodybuilder to be presented the Arjuna Award in 20 years.
Estimated to cost about Rs 81 lakh per coach, about 700 such modern coaches will be manufactured in the current fiscal.
The union government was taking effective steps to rid the country of corruption and nepotism, he said.
'It was a great experience to share the dressing room with names like Virat Kohli, M S Dhoni, Rohit Sharma. It is important to watch and learn from the seniors in the team'.
The train has a lot to offer to its passengers: Silent run, fully-sealed gangway connecting two coaches, GPS-based passenger information system, modular bio-vacuum and disabled-friendly toilets, intelligent air conditioning that adjusts cooling according to the climate and closed-circuit television for safety.